Lebanon, OR, United States

Mallard Creek Golf Course first opened in 1998. In 2015, an electrical malfunction started a fire inside the clubhouse which resulted in a total loss. This presented an opportunity for Mallard Creek to redesign the layout of the clubhouse. Portland Bolt was contacted to be a supplier of custom tie-rod assemblies.

Portland Bolt has the ability to manufacture rods to different lengths with custom thread lengths. The clevises are also assembled to ensure there won’t be any fitting issues at the job site. No matter how long or heavy the tie-rods are, we will do what it takes to ensure your order is properly packaged. If you have a project that requires tie rods, whether for heavy timber frames, awnings, or anything else, contact one of Portland Bolt estimators and they will be more than happy to assist.

Nearby Projects